Tower Bridge took 8 years
to build, completed in 1894,
The high level walkways, joining the two
towers, were provided for use by pedestrians when the deck was raised. These
walkways were however closed in 1910 due to the lack of use; pedestrians
were prepared to wait until the deck was re-lowered.
The deck is raised on average 500 times a
year. This reflects the reduction in river traffic since the bridge was
built; the deck was raised 655 times during the first month of opening. It
is however estimated that 38,000 road vehicles now use the bridge each day.
Tower Bridge Experience:
spectacular views over London from
the bridges high level walkways.
OPENING
TIMES
April
to October: 10.00am-6.30pm ,November to March:
9.30am-6.00pm, Closed: 24-25 December 2001 and 17
January 2002 (Last entry 1 1/4hours before
closing) |